Project 13

Canopy Bridge Pavilion

A connecting bridge linking the canopy retreat to a second sleeping pavilion across the ravine.

Scroll to discover
Canopy Bridge Pavilion
Concept

A bridge between two pavilions, suspended in the cloud forest canopy.

Stained Timber, Teak Decking, Low-Iron Glass, Linen Curtains carry the language of the original retreat across the void, the suspended walkway calibrated to disappear into the mist on damp afternoons.

The bridge is a room. The mist is the ceiling.

A second sleeping pavilion connected to the original Canopy Retreat by a forty-metre suspended bridge, completed in 2024. The 80 m² cabin is calibrated to the same elevation in the cloud forest canopy.

Canopy Bridge Pavilion detail
Project 13

Canopy Bridge Pavilion

Location
Monteverde, Costa Rica
Client Type
Private Individual
Gross Floor Area
80 m²
Structure
Timber Frame
Project Type
Residential
Completion
2024
Site Area
6,000 m²
Levels
1 above ground

Canopy Bridge Pavilion